Blog Entry# 4232274
Posted: Feb 15 2019 (10:30)
3 Responses
Last Response: Feb 16 2019 (20:57)
The 16-coach train was built in 18 months at a cost of Rs 97 crore by the Integral Coach Factory in Uttar Pradesh’s Rae Bareli, in...
Train 18 was built in Integrated coach factory,chennai