Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Thu Sep 5 14:14:01 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 545954
Mar 23 (13:54) Kanpur's Railway Crossing Woes: A 23-Year-Long Struggle for a Solution (www.livehindustan.com)
IR Affairs
NCR/North Central
43999 views
0

News Entry# 545954   
  Past Edits
This is a new feature showing past edits to this News Post.
read full article... 23 साल से हर चुनाव में उठता फर्रुखाबाद रेलवे क्रॉसिंग का मुद्दा

For over two decades, residents of Kanpur have been grappling with the issue of 18 railway crossings along the Farrukhabad route, causing significant traffic congestion. Despite numerous attempts since 2001, including multiple surveys and feasibility studies, a permanent solution remains elusive. This issue has resurfaced before every Lok Sabha election only...
more...
to be sidelined once the Model Code of Conduct comes into effect. The number of trains operating on this route has increased from an average of 42-44 daily in 2022 to 54-56 currently, with 10 more trains proposed. The proposed elevated track, estimated to cost over ₹1000 crores, has faced delays due to regulatory hurdles. While various proposals and surveys were conducted over the years, including an elevated track from Nanakari to Anwarganj with an estimated cost of ₹1175 crores, none have materialized. The most recent proposal, an elevated track from Mandhana to Anwarganj, with a revised cost of ₹995 crores, was sent to the Railway Board in December 2023 but faced further delays. The matter is once again in limbo, with the upcoming Lok Sabha elections hindering any further progress.

Kanpur ke traffic mein ek bada problem hai, Farrukhabad railway route par 18 railway crossings, jo logon ko bahut pareshan kar rahe hain. 2001 se, yeh problem solve karne ki koshish ho rahi hai, par abhi tak koi solution nahi mila. Har Lok Sabha election se pehle yeh issue aata hai,...
more...
par election ki guidelines aane par yeh matter chhup jaata hai. Is route par trains ki frequency bhi badh gayi hai, 2022 mein daily average 42-44 trains thi, ab yeh 54-56 trains daily ho gayi hai. Elevated track ke liye proposal banaya gaya, jiske liye ₹1000 crore se zyada cost aane ki baat hai, par regulatory hurdles ke wajah se delay ho raha hai. Bahut saare proposals aur surveys hue hain, jaise Nanakari se Anwarganj tak elevated track, jiska cost ₹1175 crore aaya, par kuchh bhi nahi hua. December 2023 mein Mandhana se Anwarganj tak elevated track ka proposal ₹995 crore ki cost se Railway Board ko bheja gaya, par phir bhi delay ho gaya. Ab fir se yeh matter Lok Sabha election ki wajah se ruk gaya.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy