Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Fri Sep 13 21:30:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 551413
May 08 (17:55) Mumbai-Ahmedabad Bullet Train Project Makes Progress with Cutting-Edge Machinery
New Facilities/Technology
BULT/Bullet Train
3045 views
0

News Entry# 551413   
  Past Edits
This is a new feature showing past edits to this News Post.
Pics Show Fleet Of ''Cutting-Edge'' Machinery Being Used For India's First Bullet Train

The Mumbai-Ahmedabad bullet train project is progressing steadily, with the National High-Speed Rail Corporation Limited (NHSRCL) sharing updates on the use of cutting-edge machinery for track construction. The machinery, designed and manufactured according to Japanese specifications, includes a Rail feeder car, Track slab laying car, CAM laying car, and Flash butt...
more...
welding machine. Notably, some of these machines are being manufactured in India under the Make-in-India initiative. The bullet train project will feature a J-Slab track system, a first in India, and progress is being made on track laying in Gujarat, with over 35,000 metric tons of rails delivered to locations like Surat and Vadodara. The bullet train, covering a distance of 508 km, will operate at a maximum speed of 320 km per hour, reducing travel time between Mumbai and Ahmedabad to 2 hours. It will start from Mumbai and stop at ten stations before reaching Sabarmati. The Railways plans to run 35 bullet trains initially, with 70 trips per day, increasing the number to 105 trains by 2050. The project's estimated cost is ₹1.08 lakh crore, with funding contributions from the Centre, Gujarat, and Maharashtra, and a loan from Japan at a minimal interest rate.

Mumbai aur Ahmedabad ke beech bullet train project bahut speed se chal raha hai, aur National High-Speed Rail Corporation Limited (NHSRCL) track construction ke liye cutting-edge machinery ka use karne ke updates share kar raha hai. yeh machines, Japanese specifications ke hisaab se design aur manufacture ki gayi hai, aur isme...
more...
Rail feeder car, Track slab laying car, CAM laying car, aur Flash butt welding machine shamil hai. Kya baat hai, Make-in-India initiative ke under, yeh machines ab India mein bhi ban rahi hai! Bullet train project mein ek J-Slab track system hoga, jo India mein pehli baar use kiya ja raha hai, aur Gujarat mein track laying ka kaam bhi bahut achcha chal raha hai, aur 35,000 metric tons se zyada rails Surat aur Vadodara jaise locations pe pahunch gaye hain. Bullet train, 508 km ki distance cover karega, aur 320 km per hour ki maximum speed se chalenge, jisse Mumbai aur Ahmedabad ke beech travel time sirf 2 hours ka ho jaayega. Yeh train Mumbai se start hogi aur Sabarmati pe pahunchne se pehle 10 stations pe rukengi. Railways ka plan hai ki shuruaat mein 35 bullet trains chalai jaayengi, 70 trips per day ke saath, aur 2050 tak yeh number 105 trains tak badha jaayega. Project ki estimated cost ₹1.08 lakh crore hai, jismein Centre, Gujarat, aur Maharashtra ki taraf se contribution aayega, aur Japan se kam interest rate pe loan bhi milega.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy