Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Thu Sep 19 18:30:48 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 570076
Yesterday (20:06) Delhi Metro Phase IV: Twin Tunnels Breakthrough on Janakpuri West - R K Ashram Corridor
Entry# 6194104   
  Past Edits
This is a new feature showing past edits to this News Post.
Delhi Metro Phase 4: First twin tunnels breakthrough completed, 3 km long tunnels built 14-15 metres underground – Details inside

The Delhi Metro Rail Corporation (DMRC) announced the successful completion of the first twin tunnels breakthrough on the Janakpuri West - R K Ashram corridor, marking a significant achievement in the Phase IV construction project. The twin tunnels, linking Derawal Nagar to Pulbangash, were excavated by two tunnel boring machines (TBMs)...
more...
that emerged concurrently at Pulbangash Metro Station. This 3-kilometer-long tunnel drive, spanning over 14 months, is the longest in Phase IV, with the TBMs operating at an average rate of 8.2 meters per tunnel per day. The tunnels, built at a depth of 14-15 meters, pass through densely populated areas like Rana Pratap Bagh and Punjabi Basti Colony, including a section beneath the Najafgarh drain. Despite the challenging environment, the TBMs successfully navigated through submerged water conditions and beneath the under-construction Ghanta Ghar station without causing any damage. The tunnels have an internal diameter of 5.8 meters and feature six cross passages for passenger safety.

Delhi Metro Rail Corporation (DMRC) ne Janakpuri West - R K Ashram corridor pe Phase IV construction project mein pehla twin tunnels breakthrough ka successful completion announce kiya hai. Ye ek bada achievement hai. Derawal Nagar se Pulbangash tak ke twin tunnels, do tunnel boring machines (TBMs) dwara khade kiye gaye...
more...
hai, jo Pulbangash Metro Station pe ek saath nikle. Ye 3-kilometer lamba tunnel drive, 14 months se zyada time mein complete hua hai, aur Phase IV mein sabse lamba drive hai. TBMs har din 8.2 meters per tunnel ki average rate se chal rahe the. 14-15 meters ki depth pe bane yeh tunnels, Rana Pratap Bagh aur Punjabi Basti Colony jaise densely populated areas se guzarte hain, aur Najafgarh drain ke neeche se bhi guzarte hain. Mushkil environment ke baavajood, TBMs successfully submerged water conditions aur under-construction Ghanta Ghar station se guzar gaye bina koi damage ke. Tunnels ka internal diameter 5.8 meters hai aur passenger safety ke liye 6 cross passages hain.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy