Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 13 08:32:22 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 1718629-0
Medium; Platform Pic; Large Station Board;
Entry# 4470444-0


CKU/Chakulia (5 PFs)
चाकुलिया
চাকুলিয়া / ଚାକୁଲିଆ / ᱪᱟᱠᱩᱞᱤᱭᱟ

Track: Triple Electric-Line

Updated: May 15 (23:47)
Chakulia Railway Station (CKU) is located in the heart of Chakulia, in the East Singhbhum district of Jharkhand. With 5 platforms, it offers basic amenities like waiting rooms and refreshment stalls. The station is known for its historic connection to the mining industry in the region, making it a fascinating spot for history buffs.

Tourism

The Chakulia Kali Temple is a revered Hindu temple dedicated to Goddess Kali.
The Jain temple near the station offers a peaceful retreat for pilgrims.
The local mosque is a prominent religious site for the Muslim community.
The Hanuman temple on the outskirts of Chakulia is a popular pilgrimage site.
The Shiva temple in the nearby village of Baramasia is a sacred place for Hindus.

Food

Hotel Amrapali serves delicious vegetarian thalis and snacks.
The Chakulia Dhaba offers a variety of vegetarian curries and breads.
Krishna Sweets is a popular spot for vegetarian snacks and sweets.
Shree Balaji Restaurant offers North Indian vegetarian cuisine.
The vegetarian stall near platform 2 is a convenient option for quick bites.

Station Address

Station Road, District East Singhbhum - 832 301
State: Jharkhand

Elevation: 123 m above sea level
Type: Regular   Category: NSG-5
Zone: SER/South Eastern   Division: Kharagpur


No Recent News for CKU/Chakulia
Nearby Stations in the News
Number of Platforms: 5
Number of Halting Trains: 29
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 2.5/5 (8 votes)
cleanliness - average (1)
porters/escalators - poor (1)
food - average (1)
transportation - average (1)
lodging - poor (1)
railfanning - excellent (1)
sightseeing - average (1)
safety - average (1)

Station Forum

Page#    Showing 11 to 15 of 38 blog entries  <<prev  next>>
General Travel
122962 views
2

Oct 20 2022 (22:30)   18030/Shalimar - Mumbai LTT Express (PT) | CKU/Chakulia (5 PFs)
RailfanRanga~
RailfanRanga~   220 blog posts
Entry# 5520267            Tags   Past Edits
Experimental stoppage of 18030/18029 Shalimar - Lokmanya Tilak - Shalimar Express at Chakulia station.
Translate to English
Translate to Hindi
Info Update
22790 views
3

Feb 06 2021 (17:54)   JGM/Jhargram (6 PFs)
SAPTARSHI^~
SAPTARSHI^~   26763 blog posts
Entry# 4868852            Tags  
COMMISSIONER OF RAILWAY SAFETY TO INSPECT NEWLY CONSTRUCTED THIRD LINE IN KALAIKUNDA-JHARGRAM SECTION

Commissioner of Railway Safety, South Eastern Circle will inspect newly constructed 3rd line between Kalaikunda-Jhargram of Kharagpur-Adityapur 3rd line project on 09.02.2021.

In
...
more...
this connection all railway users of Railway lines and premises situated on the completed section of South Eastern Railway to note that 25000 Volt, 50 Hz, AC overhead traction wires is energized in this section. The overhead traction line is energized and to be treated as live at all times and no unauthorised person shall approach or work in the proximity of the said overhead line.

It is notified for information of the public that in connection with energization of 25 Kv Electric Traction over the new 3rd line between Kalaikunda-Jhargram of South Eastern Railway, height gauges have been erected at all the level crossings with clear maximum height of 4.78m above road level with a view to prevent loads of excessive height from coming into contact or dangerous proximity to live traction wire, which shall be at a height of maximum 5.5m above the rail level at level crossings.

During this inspection speed trial will be conducted with special train in this Jhargram-Kalaikunda section on 09.02.2021. All are requested to keep away from the track for safety of life and property.

......... click here

Translate to English
Translate to Hindi

2 Posts

19976 views
2

Sep 20 2022 (18:11)
SAPTARSHI^~   26763 blog posts
Re# 4868852-3            Tags   Past Edits
CRS Inspection of Chakulia-Ghatsila 3rd line on 20/09/22 ____ C:Swarna Chandra
Translate to English
Translate to Hindi
General Travel
26709 views
0

Jul 30 2022 (16:49)   58021/Kharagpur - Tatanagar Passenger (UnReserved) | TATA/Tatanagar Junction (6 PFs)
PiyushSrivastava^~
PiyushSrivastava^~   20730 blog posts
Entry# 5430667            Tags   Past Edits
Hopes for TATA CKU and TATA KGP Passengers to return??
Translate to English
Translate to Hindi

More Posts
General Travel
487210 views
6

Mar 31 2022 (11:16)   18183/Tatanagar - Buxar Express | TATA/Tatanagar Junction (6 PFs)
PiyushSrivastava^~
PiyushSrivastava^~   20730 blog posts
Entry# 5258810            Tags   Past Edits
3 compliments
Phr khaali hath 🖐️ aaya hoga MP !! 🤣😂😂😂 Ok Thanks.
Mr. Bidyut Baran Mahato again submitted his repeated demands to Railway Minister.
Enclosed: Images from Twitter
His tweets:
केंद्रीय रेलमंत्री श्री
@AshwiniVaishnaw
...
more...
जी एवं रेलवे बोर्ड के अधिकारियों के साथ कई महत्वपूर्ण विषयों पर चर्चा की। इसके अलावा उन विषयों पर अपना दृष्टिकोण से अवगत कराया।उनसे कहा टाटा से बक्सर के लिए सीधी ट्रेन सेवा की आरंभ यथाशीघ्र किया जाए।मैं इसको लेकर कई वर्षों से प्रयासरत हूं। अपने बैठक में बक्सर के लिए एक अन्य प्रस्ताव भी केंद्रीय रेल मंत्री के समक्ष रखा। यदि बक्सर तक सीधी रेल सेवा जाने में तकनीकी अड़चन है, तो एक वैकल्पिक मार्ग का सुझाव है की टाटा से गया, डेहरी - आन - सोन, मुगलसराय, बक्सर,आरा होते हुए दानापुर तक एक नई ट्रेन सेवा की शुरुआत की जाए। इससे बक्सर स्टेशन पर जो तमाम तकनीकी कमी है, उसकी पूर्ति हो जाएगी और बिहार के साथ-साथ उत्तर प्रदेश के सीमावर्ती जिला के लोगों को भी अतिरिक्त सुविधा मिलेगी। बैठक में रेल मंत्री ने कहा कि यह विचारणीय विषय है। उन्होंने उपस्थित पदाधिकारियों को इस पर गौर करने को कहा। रेल मंत्री के सचिव वेद प्रकाश जी ने इस संबंध में एक अन्य सुझाव देते हुए कहा कि रांची से जो ट्रेन आरा तक जा रही है,उस ट्रेन को टाटा तक विस्तारित किया जा सकता है। इसपर मंत्री जी से कहा कि वे इसपर गंभीरता पूर्वक विचार करें और बक्सर के लिए सीधी रेल सेवा यथाशीघ्र कैसे प्रारंभ हो इसे सुनिश्चित करें। रेल मंत्री ने आश्वस्त किया कि वे सभी पदाधिकारियों को इस बाबत समुचित निर्देश जारी करेंगे। इसके अतिरिक्त टाटा - जम्मू तवी, टाटा एलेप्पी, टाटा एलटीटी ट्रेन को पुनः प्रारंभ करने के लिए कहा एवं टाटा से बेंगलुरु के लिए एक नई सुपरफास्ट ट्रेन सेवा की भी मांग की। चर्चा के क्रम में मैंने हटिया - हावड़ा एक्सप्रेस का चाकुलिया स्टेशन पर ठहराव करने एवं उत्कल एक्सप्रेस का रखा - माइंस स्टेशन पर ठहराव करने की अपनी पुरानी मांग को दोहराई। इसके अलावा टाटा - जयपुर एवं टाटा - भागलपुर ट्रेन सेवा की मांग की आवश्यकता को भी रेखांकित किया। बैठक के अंत में चाकुलिया बुड़ामारा रेलवे लाइन का काम झारखंड क्षेत्र में बाधित है, उसे पुनः प्रारंभ करने के लिए कहा। मा. रेलमंत्री को सूचित किया कि चाकुलिया बुड़ामारा रेलवे लाइन में झारखंड क्षेत्र में भूमि अधिग्रहण का काम बाकी है, इस कारण से यह कार्य आगे नहीं बढ़ पा रहा है। मैंने मा. रेलमंत्री @AshwiniVaishnaw जी से आग्रह किया कि वे इस संबंध में राज्य सरकार से वार्ता कर इस प्रक्रिया को आगे बढ़ाएं। मा. रेलमंत्री जी ने आशास्वित किया और कहा कि इस संबंध में राज्य सरकार से पत्राचार करेंगे।

Translate to English
Translate to Hindi

More Posts
General Travel
29359 views
1

Mar 19 2022 (12:03)   JGM/Jhargram (6 PFs)
guest
Entry# 5247426            Tags   Past Edits
The 3rd line between Jhargram-Chakulia (29 km) of Kharagpur-Adityapur section of South Eastern Railway has been commissioned for traffic at 90kmph #Thirdline #CRS
Translate to English
Translate to Hindi
Page#    Showing 11 to 15 of 38 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy