Presently its Coach Composition is slightly skewed..
With conversion to LHB rake, the following CC will be beneficial :
At Present:
1A : 20 berths (HA1 + HA2)
2A : 46+20+20 = 86 Berths...
more... ( A1 + HA1 + HA2)
3A : 64 berths (B1)
SL : 832 berths (S1-S13)
GEN : 4 Coaches
SLR : 2 coaches
At present 24 coaches..
After LHB Conversion:
1A : 24 berths (H1)
2A : 104 berths (A1 A2)
3A : 144 berths (B1 B2, much needed change)
SL : 792 berths (S1-S11)
GEN : 4 coaches
EOG : 2 Coaches
Total 23 coaches.. {If ECR is ready for making it 23 LHB coacher train.. If not then even if B2 is not attached, overall 30 AC berths will increase in lieu of 40 Sleeper berths }