Magadh Express splits into two after its coupling breaks in BiharOn September 8th, 2024, the Magadh Express (Train No. 20802) travelling from New Delhi to Islampur experienced a coupling failure between coaches 13 and 14 near Twiniganj station in Buxar, Bihar. The incident occurred at approximately 11:06 a.m. while the train was moving at 50 km/h. The loco pilot, alerted by...
more... the guard, swiftly stopped the train, preventing a major accident. Although the train split into two parts, with the AC and sleeper coaches separating, no casualties were reported. The train departed from Raghunathpur at 2:25 p.m. after the coupling was repaired. Train traffic on the down line was disrupted, leading to the diversion of several trains. A team from the Railway Protection Force (RPF) was dispatched to the scene to ensure passenger safety and comfort.
8 September 2024 ko, Magadh Express (Train No. 20802) jo New Delhi se Islampur jaa raha tha, Buxar, Bihar mein Twiniganj station ke paas, coach 13 aur 14 ke beech coupling break ho gaya. Yeh incident subah 11:06 AM ke aas-paas hua jab train 50 km/h ki speed se chal rahi...
more... thi. Guard ne loco pilot ko inform kiya aur train ko jaldi se rok diya, ek bada accident hone se bach gaya. Train do hisson mein baant gayi, AC coaches aur sleeper coaches alag ho gaye, lekin koi casualty report nahi hai. Train 2:25 PM pe Raghunathpur se chali, coupling fix hone ke baad. Down line mein train ka traffic affected hua, jiske karan kaafi trains divert ki gayi. Railway Protection Force (RPF) ki team ko spot pe bheja gaya tha passengers ki safety aur comfort ke liye.