At Thane station waiting for the train arrival
Train expected @ 5:52 am
Thane dep at 05:57
KYN WDM3D 11470 LHF in lead..
Same loco used since Monday.
Xing Diva jn
16860 WDM2 LHF with Diva Sawantwadi pass
Panvel dep
06:50 arrival on PF7
KYN WDG3A 14567R arrived on PF6 at Panvel @ 06:58.
Xing Roha at slow speed..
N entering KR.