Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Fri Sep 6 22:39:29 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 561507
Jul 22 (13:04) Bengaluru Metro's Yellow Line Set to Open by End of 2023 with 8 Trains and 15-Minute Frequency (www.deccanherald.com)
Metro
BMRC/Bangalore Metro
6818 views
0

News Entry# 561507   
  Past Edits
This is a new feature showing past edits to this News Post.
read full article... Bengaluru's Yellow Line will open in December with 8 trains and 15-min frequency, says BMRCL

The Bengaluru Metro's Yellow Line, connecting RV Road to Bommasandra, is set to open by the end of 2023 with a minimum of eight trains operating at a 15-minute frequency. This marks a change from earlier plans of six to seven trains with a 20-minute frequency. The 19.15 km line, costing...
more...
Rs 5,745 crore, features 16 stations, including Jayadeva Hospital, BTM Layout, Silk Board Junction, and Electronics City. Jayadeva Hospital, standing at 39 meters, is the tallest metro station in India and will act as an interchange station with six levels. Full-scale trial runs began on June 13th with a prototype six-coach train imported from China. These trials, including oscillation and safety checks, are expected to be completed by September-October, allowing for commercial operations to begin in December if enough trains are available. CRRC Nanjing Puzhen Co Ltd is supplying 216 coaches (36 trains) for Rs 1,578 crore, with 12 coaches manufactured in China and the rest assembled by TRSL in Bengal. TRSL began production on May 18th, and the first train from TRSL is expected to reach Bengaluru by August 10th or 15th. According to the contract, CRRC-TRSL will deliver two trains each month after the initial delivery. If this timeline is followed, two trains will be delivered every month from September to December, ensuring a timely launch by the December deadline.

Bengaluru ka Yellow Line, RV Road se Bommasandra tak, is saal ke end tak open ho jaayega, minimum aath trains aur 15 minutes frequency ke saath. Ye pehle ke plans se badal gaya hai, jisme six to seven trains aur 20 minutes frequency tha. Rs 5,745 crore ka 19.15 km line,...
more...
16 stations hai, jisme Jayadeva Hospital, BTM Layout, Silk Board Junction, aur Electronics City bhi hai. 39 meters ka Jayadeva Hospital, India ka sabse uncha metro station hai, aur yeh six levels wala interchange station hai. June 13 ko, BMRCL ne full-scale trial runs shuru kiye, prototype six-coach train se, jo February mein China se aaya tha. Ye trials, oscillation aur safety checks ke saath, September-October tak khatam hone ki ummeed hai, December mein commercial operations shuru karne ke liye, agar kaafi trains available hain. China ki CRRC Nanjing Puzhen Co Ltd, BMRCL ko 216 coaches (36 trains) supply kar rahi hai, Rs 1,578 crore mein. Barah coaches China mein banaye gaye hain, aur baaki Bengal mein CRRC ke Indian partner, Titagarh Rail System Ltd (TRSL) ne assemble kiye hain. TRSL ne production 18 May ko shuru ki thi. BMRCL Managing Director M Maheshwar Rao ne bataya hai ki TRSL ka pehla six-coach train August 10 ya 15 tak Bengaluru pahunch jaayega. Contract ke mutabiq, CRRC-TRSL har mahine do trains deliver karega, initial delivery ke baad. Agar ye timeline follow hota hai, toh September se December tak har mahine do trains deliver ki jayengi, December deadline tak launch ke liye.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy